What we do and who it is for
We provide electrical work to support Smart Export Guarantee (SEG) applications — including G98/G99 notifications, meter and consumer unit checks, remedial work and quoted prices from £XXX (written estimate before work). Whitstable: serving CT5, Tankerton, Seasalter, Swalecliffe, Joy Lane and Church Street. All work is carried out by qualified electricians and comes with certification and a workmanship guarantee to meet distribution network and safety requirements.
Typical jobs
- For older properties in Whitstable town centre and the riverside conservation areas, where cellars and meter positions vary in terraces and converted flats, we carry out panel testing where required, assess existing circuits and identify defects (for example shared supplies in multi‑occupied houses) that could affect safe connection or metering accuracy.
For older Whitstable homes, particularly the inter‑war and Victorian properties in the town centre and parts of Church Street and Joy Lane, we’ll also flag VIR, rubber or aluminium wiring concerns. We keep the scope proportionate to the local housing stock and distribution network: only works needed for safety, notification and reliable export for properties in Whitstable and its immediate neighbourhoods.
What it costs
SEG-related electrical work in Whitstable is quoted to the actual scope after a free survey, since G98/G99 activity can reveal issues with inverters, export limits, protective devices or the consumer unit. Below are typical job prices (including VAT, parts, labour, testing and certification where shown).
| Job | Price | What's included |
|---|---|---|
| Electrical survey | Quoted per job after a free survey | Scope assessment |
| Fault finding | £80/hr | Testing and diagnosis |
| Consumer unit replacement | £500–£700 | Parts, testing, certificate |
Not included: plaster repairs, decoration, asbestos removal, DNO supply-upgrade charges, scaffold/access equipment.
How the work is planned
Before any G98 or G99 work, we’ll carry out a free survey to confirm the generation equipment, inverter settings, export capacity, earthing arrangement and condition of the consumer unit. We’ll identify whether remedial electrical work is needed first, particularly where older wiring or limited consumer-unit capacity affects safe connection.
We’ll then plan the most economical sequence of works, allowing for isolation periods, access routes and any roof, loft or external equipment requirements. Good site logistics reduce disruption, repeat visits and avoidable labour costs. Our team scheduling coordinates electricians, solar installers and any network-related attendance so the installation can proceed efficiently. We’ll agree dates, expected duration and any power interruption with you before starting. If the survey finds upgrade work is necessary, we’ll price it separately in writing, so you can decide whether to proceed.
Compliance and documentation
For G98 and G99 export connections we will provide electrical certification, commissioning records and any network-notification paperwork that is commonly required to demonstrate a compliant installation and to support an application to the Smart Export Guarantee; these documents typically include test results, inverter settings, generation details and confirmation of the Distribution Network Operator (DNO) process relevant to the connection. Certificates will be issued after completion and verification of the installation so you receive paperwork that is generally accepted by energy suppliers, for property records and for future maintenance. Keep records — certificates, commissioning sheets, export-meter details and DNO correspondence — for the life of the system, as suppliers’ requirements, battery additions or a change of ownership can mean these documents are needed. Our fixed written quote sets out the documentation we will provide so you can budget accordingly; we will not treat paperwork as an optional extra because incomplete evidence can delay export registration or lead to additional work or costs.
Minimal disruption and out-of-hours working
To keep disruption to a minimum, we’ll plan G98 or G99 export works around access, cable routes, consumer-unit shutdowns and the DNO process before installation starts. We’ll identify when isolation is necessary, protect occupied areas and sequence testing so your supply interruption is as short as safely possible.
Where timing permits, we can arrange out of hours work for essential changeovers, testing or final commissioning. This is charged at £120 per hour, so we’ll confirm the fixed written cost before proceeding and only recommend it where it reduces operational impact.
Noise reduction measures include pre-cutting containment where practical, using appropriate low-noise tools and scheduling drilling during agreed periods. We’ll maintain safe access, complete required verification and leave the installation compliant for export notification or approval.
Premises and sites around Whitstable
For properties in each of these named areas we confirm whether the scheme should proceed as a G98 notification or a G99 application for larger export capacity.
Where we work in the oldest homes in Whitstable — particularly late‑Victorian terraces in the town centre and Swalecliffe — we look for VIR, rubber or aluminium wiring dating from the late 19th century through the mid‑20th century and investigate these before any generation equipment is connected.
Before work starts on any job in Whitstable we provide a fixed written price that covers the specified work for that named property, including the required certification and the G98/G99 notification or application administration relevant to the Whitstable DNO.